Dewali Hydro Power Project (13MW) |
Home: Projects - Hydro Power Project - Dewali Hydro Power Project (13MW)
|
The Dewali Small
Hydro-Power Project is also a run-of-river
type project, located on the river Nandakini,
about 3 km downstream from the Rajwakti
unit. The construction of the project is
scheduled to start in April 2024. The
project will be commissioned by July 2025.
To be built at a cost of USD 25 million, the
project entails the construction of:
- Bridges and roads to
facilitate excavation and
transportation of materials to the
site.
- RCC Diversion Weir with
gated under-sluice, Intake and ungated
overflow section.
- Water Conductor System
consists of 2.85 km, 3.2 metre dia tunnel
and 0.5 km 2.6 metre dia penstock
- Surface Power House
with turbine setting 12 metre below
ground level.
|
|
|
|