Rajwakti Hydro Power Project (4.4MW) |
Home: Projects - Hydro Power Project - Rajwakti Hydro Power Project (4.4MW)
|
Him
Urja set up its first SHP at Rajwakti near
Nandprayag in the Chamoli District of
Uttarakhand. This run-of-river project is
located on the river Nandakini, a tributary
of the river Alaknanda. The construction of
this project was started in January 2000 and
completed in April 2002
Built at a cost of $5 million, the project
entailed the construction of:
- Bridges and
roads to facilitate excavation and
transportation of materials to the
site.
- RCC Diversion weir:
with gated undersluice and Intake and
ungated Overflow section
- Water Conductor System
consist of 1.2 km RCC Box 2.1x3.0 mtr
and penstock 2.2 mtr dia, 1.2 km long.
- Surface Power House
with turbine setting 7m below ground
level.
|
|
|
|